First, the device name: Manual two-tank ultrasonic cleaning machine
two, the device model: XG-2030T
three cleaning process:
feeding → ??ultrasonic cleaning (1 #) → Municipal water rinse (2 #) → cutting four, cleaning tank function Configuration:
Cleaning process |
Crafts
|
Cleaning fluid
|
Cleaning Time
|
Heating
|
Working Temperature
|
Filter
|
Ultrasonic cleaning |
Ultrasound
|
Agent
|
3-5min
|
6kw
|
RT-80 ℃
|
Have
|
Rinse
|
/
|
City water / water
|
3-5min
|
/
|
Fifth, the device process parameters:
the first slot: Ultrasonic cleaning tank (1 slot)
-
Tank size: 500 × 500 × 450mm (L × W × H)
-
Tank Material: δ2mm 304 stainless steel plate; vibrating surface using δ2.5mm 304 stainless steel plate;
-
Structure: the bottom of the tank to facilitate drainage;
-
Ultrasound: Power: 30pcs × 50W, Frequency: 28kHz; ultrasound bottom trembler; imported chips, it excited digital display controller;
-
Heating: heating 6kw, mechanical thermostat, temperature continuously adjustable;
Filtration system:
1. Filtration: 20μmm, 10-inch single stainless steel filter.
(2) Filter Pump: 1/2hp magnetic circulation pump.
3 Includes coarse filter check valve piping components.
4. Reservoir size: 400 * 300 * 420mm
The second slot: City Water rinsing tank (1 slot)
-
Tank size: 500 × 500 × 450mm (L × W × H)
-
Tank Material: δ2mm 304 stainless steel plate;
-
Structure: the bottom of the tank to facilitate drainage;
-
Outer seal plate are made of stainless steel, sus304 # 1.0mm
-
Frame Case: Let the opening and closing doors, ease of maintenance work
Seven, the main ingredient in Description:
-
Cleaning tank: imported 2.0mm, 2.5mm 304 stainless steel plate
-
Equipment rack: high quality stainless steel profiles 40 * 40 * 2.0mm Production
-
Heating plate with Taiwan, "Paul Long" brand;
-
Electrical components using high-quality components.
Eight, equipment acceptance standards and services:
1 , device acceptance criteria:
-
Device configuration to meet the technical requirements in the agreement;
-
Features of the device to meet the technical requirements in the agreement;
-
Appearance of the equipment meets the technical requirements in the agreement;
-
Plant and equipment to the user after the installation is complete, no-load running test to confirm installation accuracy;
2 , equipment installation:
-
Equipment to the construction site to provide users all the details needed to prepare on-site equipment installation;
-
Equipment manufacturing factory site installation and commissioning in the user equipment;
3 , equipment training:
During installation, manufacturing plant operatives in the field for the user to provide training, training includes normal operation, maintenance and operation of problem analysis and emergency procedures nine, after-sales service commitment:
1 , in charge of the project equipment design, complete sets of production, to ensure that equipment meet the contract requirements;
2 , free for the buyer to provide theoretical and technical training;
3 ,the warranty period for a free inspection and maintenance of equipment sent free guide;
4 , the date of acceptance from the device, responsible for the 12 months free warranty; equipment operation fails, ensure sent in fourworking hours to arrive at the scene and troubleshooting;
5 , free lifetime technical support;
6 , delivery to your plant, is responsible for installation and commissioning ;-stop service.
|